Back to Elk Run fence installation
Elk Run Homeowners Associations · Maple Valley, WA

Elk Run HOA Approved Fencing

Division-specific CC&Rs, official governing documents for Divisions 3 and 5, and picture-frame cedar builds that clear the board for your Elk Run lot—because this neighborhood is five associations, not one.

Official Div. 3 & 5 CC&Rs, bylaws, declaration
Confirm your division before you design
Board package prep included

Official documents for Elk Run HOA approved fencing

Elk Run does not publish a dedicated fence application. Five divisions keep separate governing documents. Divisions 3 and 5 post CC&Rs, bylaws, and a declaration at elkrunhoa3and5.com. Other lots sit in Divisions 1, 4, or 6 and need those boards’ paperwork. Use the association files below if you are in 3 or 5, then assemble drawings for your board.

Official Elk Run Divisions 3 & 5 site

Official association · Governing doc

Elk Run Division 5 CC&Rs

Covenants for Elk Run Division 5, posted by the Div. 3 & 5 association. Confirm height, materials, and setbacks here before you draw.

Open official PDF

Official association · Governing doc

Elk Run Divisions 3 & 5 Bylaws

Association bylaws posted on the Div. 3 & 5 documents page.

Open official PDF

Official association · Governing doc

Elk Run Divisions 3 & 5 Declaration

Declaration posted by the Div. 3 & 5 association.

Open official PDF

MyFence prep guide · Prep guide

Elk Run HOA Fence Submission Checklist

Our homeowner checklist covering the five-division structure, Div. 3 & 5 streets, site plan, and picture-frame cedar notes. Not a substitute for your division’s CC&Rs.

Download PDF

Elk Run division fence process

1

Identify your division

Standards are not uniform. Divisions 3 and 5 cover SE 277th Place, SE 279th Street, 226th Court SE, and 227th Court SE. Other lots sit in Divisions 1, 4, or 6. We read your division’s CC&Rs before we draw.

2

Match height, materials, and setbacks

Picture-frame cedar is commonly accepted because both faces finish clean. Rear yards on former fairways often want a lower decorative run or hogwire with a cedar frame so the green space stays visible.

3

File with your division board

There is no public fence-application PDF. Some divisions want a formal architectural packet; others want written notice. We assemble whatever your board asks for. Do not start construction until that written OK is in hand.

4

Install to the approved plan

We build to the approved layout—accounting for mature root zones, moisture at grade, and long unobstructed runs along the old golf-course edge.

What makes fencing HOA-approved in Elk Run

Boards care that the fence matches that division’s documents: height, materials, street setbacks, and finish. Submitting a generic Maple Valley design is the usual reason a project gets stopped. MyFence.com starts with your division’s CC&Rs so the drawing the board sees is the fence we install.

  • Division identified and CC&Rs reviewed before design
  • Picture-frame or privacy cedar matched to street-facing rules
  • Fairway-edge lots planned for sightlines across open green space
  • Site plan, elevations, and material specs attached when the board requires a packet

For install coverage, styles, and Elk Run project photos, visit the Elk Run fence installation page.

How MyFence.com helps Elk Run homeowners

Division-first design

We request your CC&Rs up front so the fence is written to the right board—not a neighboring division’s rules.

Fairway-edge layouts

Long rear runs along former golf-course greens get measured to the inch so the line stays straight without a neighbor fence to follow.

Checklist + install

Use the governing docs and our checklist to prep, then we build cedar or hogwire systems to the approved plan.

Contact Us About Your Elk Run, Maple Valley Fence

Tell us about your project and we'll get back to you within 24 hours.

Prefer to talk? Call us at (253) 455-1885

Elk Run HOA approved fencing FAQs

What is Elk Run HOA approved fencing?

It means your fence follows the CC&Rs for your specific Elk Run division—height, materials, and placement—with whatever written approval that board requires before install.

Does Elk Run have one HOA?

No. There are five divisions. Divisions 3 and 5 share elkrunhoa3and5.com and post CC&Rs, bylaws, and a declaration there. We confirm your division before we design.

Is there an official Elk Run fence application PDF?

Not on the public Div. 3 & 5 site. Use the CC&Rs, bylaws, and declaration linked above, then ask your board what written approval they want.

Do I need approval before installation?

Typically yes, regardless of height. King County permits are a separate question. We schedule Elk Run installs after your division’s written OK.

Ready for Elk Run HOA approved fencing?

Open the Div. 3 & 5 governing docs, or let us review your division CC&Rs and build. Free on-site estimates in Elk Run / Maple Valley.