Tehaleh HOA Approved Fencing
Design Review steps, a submission checklist, and fence builds stained Sherwin-Williams Cedar Bark (SW 3511) or clear, per the Tehaleh Design Manual, that pass Tehaleh review for Upper and Lower neighborhoods—without chain-link shortcuts that get rejected.
Downloads for Tehaleh HOA approved fencing
Tehaleh’s official Design Review packet is issued by association management (Cohere / Tehaleh Owner's Association)—it is not a single public fence PDF. Use our checklist to prep a complete package, then request the current forms when you file. Note: 253-205-8190 (tehaleh.com/contact-us) is the Tehaleh Welcome Center, the community's visitor information center, not the association; ask association management for Design Review forms.
Prep guide
Tehaleh HOA Fence Submission Checklist
MyFence.com homeowner checklist covering phase confirmation, the Design Manual stain (Cedar Bark SW 3511 or clear), site plan, drawings, and association contact steps. Not a substitute for the official ARC packet.
Tehaleh Design Review fence process
Confirm your phase
Upper Tehaleh, Lower Tehaleh, Trilogy, and Discovery Park can differ slightly on placement and style. Confirm which guidelines apply to your lot before drawing the fence.
Prep drawings to the Design Manual standards
The Tehaleh Design Manual lists Sherwin-Williams Cedar Bark (SW 3511) semi-transparent stain or a clear stain for standard fences and does not allow chain-link or vinyl without committee approval. Assemble a site plan, elevations, materials list, and stain/color samples, and confirm the finish with the review committee.
Request the current ARC packet and submit
Contact Tehaleh Owner's Association management (Cohere) for the current Design Review forms, then submit a complete package. Do not start construction until written approval arrives.
Install to the approved plan
We build cedar privacy, hogwire, and hybrid systems to the approved layout—wind-ready on the plateau, trail-smart in Lower Tehaleh.
What makes fencing HOA-approved in Tehaleh
Tehaleh’s Design Review Committee looks for neighborhood-character designs: the Design Manual stain (Sherwin-Williams Cedar Bark SW 3511, or clear), appropriate height and placement, and materials that fit the master-planned setting. Trail-adjacent and plateau lots add setback and wind considerations. MyFence.com prepares packages that already match what reviewers expect.
- Sherwin-Williams Cedar Bark (SW 3511) or clear stain per the Tehaleh Design Manual, confirmed with the review committee (no chain-link)
- Site plans with lot lines, trailside setbacks, and gate locations
- Elevation drawings and stain/color samples ready for Design Review
- Wind-ready hybrid options for Upper Tehaleh; family-safe builds for Lower Tehaleh
For Upper or Lower install detail, start with the Lower Tehaleh fence installation page or visit the Upper Tehaleh fence installation page below.
How MyFence.com helps Tehaleh homeowners
Design Review packages
Drawings, specs, and samples assembled so your association packet is complete on day one—no extra HOA paperwork fee.
Phase-aware designs
Upper plateau wind loads, Lower Tehaleh trail setbacks, and the Design Manual stain finish confirmed with the review committee.
Checklist + install
Use our checklist to prep, then we build cedar, hogwire, or hybrid systems exactly to the approved plan.
Contact Us About Your Tehaleh, Bonney Lake Fence
Tell us about your project and we'll get back to you within 24 hours.
Prefer to talk? Call us at (253) 455-1885
Tehaleh HOA approved fencing FAQs
What is Tehaleh HOA approved fencing?
It means your design, materials, height, color, and placement pass Tehaleh Design Review before install. Cedar, hogwire with cedar frame, and hybrid aluminum/cedar are commonly approved; the Design Manual's standard stain is Sherwin-Williams Cedar Bark (SW 3511) or clear, and chain-link is typically prohibited. Confirm your finish with the review committee.
Where can I get the official Tehaleh fence forms?
Request the current Design Review packet from Tehaleh Owner's Association management (Cohere). Use the checklist PDF on this page to prepare drawings and samples while you wait for the official forms.
Do Upper and Lower Tehaleh have the same rules?
Core stain and style standards are similar, but phase-specific placement and trail/plateau details can differ. We confirm your phase guidelines before drawing the package.
Do I need approval before installation?
Yes. Do not start construction until Design Review provides written approval. We schedule install after approval.
Ready for Tehaleh HOA approved fencing?
Download the checklist, or let us handle the Design Review package and build. Free on-site estimates for Upper and Lower Tehaleh.
